Do You Need a Permit for a Bathroom Remodel in Seattle? [2026]

September 23, 20265 min read

Quick Answer

Yes — if your bathroom remodel relocates plumbing, adds electrical circuits, changes structure, or converts a bathtub to a shower. No — if you're replacing fixtures like for like in the same location, or doing cosmetic work. Permits in Seattle are issued by SDCI, typically cost $500–$1,500, and add 1–3 weeks to the schedule.

Permit required or not: the quick table

ProjectPermit needed?Type
Replacing a faucet, showerhead, or toilet in the same spotNo
Replacing a vanity without moving the plumbingNo
Paint, mirrors, accessories, towel barsNo
Replacing a bathtub like for like in the same locationNo
Converting a bathtub to a showerYesPlumbing
Relocating a toilet, sink, or shower drainYesPlumbing
Adding a fixture that didn't exist (second sink, bidet)YesPlumbing
Adding or moving electrical circuits, outlets, or heated floorsYesElectrical
Installing an exhaust fan where none existedYesElectrical / mechanical
Removing or moving a wall — even a non-load-bearing oneYesBuilding
Adding a bathroom to an unpermitted spaceYesBuilding + trades

Why a tub-to-shower conversion needs a permit

This surprises most homeowners, because nothing appears to move.

The drain rule

Bathtubs drain through a 1.5-inch line. Showers require a 2-inch line. Water leaves a shower faster than it leaves a tub, and Seattle's plumbing code reflects that. So converting means opening the floor, upsizing the drain, and re-establishing the trap and vent correctly.

That's a fixture alteration, not a like-for-like replacement — which puts it squarely in permit territory. Any contractor who quotes a conversion without mentioning the drain is either leaving the old 1.5-inch line in place or hasn't thought the job through. Full conversion guide here.

Who issues the permit

In Seattle: the Seattle Department of Construction and Inspections (SDCI), through the Seattle Services Portal. Simple bathroom permits are often approved over the counter or within one to three weeks.

Outside Seattle: each city runs its own department — Bellevue, Kirkland, Redmond, Bothell, Shoreline, Edmonds, Lynnwood and Everett all issue their own. The underlying rules are consistent, because they all work from the Washington State Building and Plumbing Codes.

Your contractor should pull it. A licensed contractor applying under their own license carries the responsibility for the work meeting code. If a contractor suggests you pull it as the homeowner, or suggests skipping it, treat that as a red flag.

What permits cost and how long they take

Typical
Cost, simple bathroom scope$500 – $1,500
Approval time, simple scopeOver the counter to 3 weeks
Approval time, structural workLonger — engineering drawings may be required
InspectionsUsually 1–2 during the project

Washington State allows homeowners to do plumbing work on their own single-family residence — but the permit and inspections are still required, and the work must meet the same code standard as professional work.

What happens if you skip the permit

Two problems, one immediate and one delayed.

Immediate

SDCI can issue a stop-work order and require unpermitted work to be exposed for inspection. That can mean opening walls you've already finished and tiled.

Delayed

Unpermitted bathroom work appears in your seller disclosure. Buyers use it as leverage, lenders occasionally flag it, and correcting it retroactively costs far more than permitting it correctly the first time. Insurance claims for water damage traced to unpermitted work can also be contested.

The math almost never favors skipping. A $500–$1,500 permit against opening a finished wall is not a close call.

Frequently Asked Questions